A group outing with a lot of fun and team focus

 
 

Can your group break the underground marble run record?

A little ambition is quickly awakened in this "hands on" team building activity. What does it take to be successful? Doers or thinkers, or maybe a good mix of both elements? Many roads lead to the goal when the marble is rolling. Bring your team's strengths to meet this challenge. Laughs and valuable conclusions about current team dynamics are guaranteed.

As we have enough space in our underground system, this experience can easily be undertaken at the same time as the standard guided tour or the Domino track building.

We are pleased to realize your event.

Contact us

More teambuilding: Domino track building

Video " team building on record hunt"

(DE)

Hall of Fame (Podium)

Current record: 4 minutes 15 seconds

Group: Verein Sportfreunde Oberland

Date of Record set: 6th April 2023

Team strength: 8 persons

Currently 2nd: 3 minutes 26 seconds

Group: Apprentices Notter Group

Company: Notter Group

Date of Record set: 13th January 2023

Team strength: 13 persons

Currently 3rd: 3 minutes 10 seconds

Group: RECA Selection

Company: RECA

Date of Record set: 21th of November 2023

Team strength: 25 persons

Currently 4th: 2 minutes 49 seconds

Group: OK Tour de Suisse Start-Hub Einsiedeln 2023

Company: Einsiedeln-Ybrig-Zürichsee AG

Date of Record set: 9th of June 2024

Team strength: 10 persons

Currently 5th: 2 minutes 30 seconds

Group: FMA's slow marbles

Company: FMA, Financial Market Authority Liechtenstein

Date of Record set: 22th of September 2021

Team strength: 24 persons

Currently 6th: 2 minutes 6 seconds

Group: ref. Kirchgemeinde Liestal-Seltisberg

Date of Record set: 7th of September 2024

Team strength: 18 persons

Currently 7th: 1 minute 28 seconds

Group: "Hörnli und G'Hackets" from the Sarganserland

Date of Record set: 19th of April 2021

Team strength: 9 persons

Game Rules

  • The goal is to let the marble roll as long as possible
  • Every 2 meters a different material must be used and at least one small change of direction must be incorporated
  • Tying with string is allowed
  • Tape is not allowed
  • Drilling holes is not allowed
  • The marble run must pass through at least one of the 2 SBB wagons
  • The starting point of the marble run can be determined by the participants themselves, but must be outside the SBB wagon
  • Only materials provided in the starting area may be used
  • During the 10-minute "rolling and measuring time", patching is still allowed; once the 10 minutes have elapsed, rolling is no longer allowed.

Information

Time:

  • 90 minutes

Procedure:

  • Walk to the pitch 10 minutes
  • Instruction 5 minutes
  • Construction of the marble run 45 minutes
  • Let the marble roll and measure the record distance 10 minutes
  • Clean up 10 minutes
  • Way back 10 minutes

Price:

  • CHF 540 Package up to 30 persons

Image Gallery Marble Track Building

More ideas

Optional activities to add on

Add on a show explosion or a wine degustation!

Looking for more group event ideas?

Teambuilding games and many more company event ideas are at hand!

Discover now!
Amberg Group
100%
family-owned
7
companies
600+
employees

For around 60 years, the renowned Swiss Amberg Group has been a leader in engineering and surveying services for railway, metro, underground and specialised civil engineering. 

The family-owned company is an innovative knowledge, engineering and technology provider in the field of logistics and infrastructure for smart cities, hubs and networks. We provide outstanding solutions for our customers through innovatively combining above-ground and underground space utilisation.

go to website
Amberg Engineering

Your underground experts 

  • Rail tunnels, including high-speed rail
  • Metro lines
  • Tunnel and shaft infrastructure
  • Caverns with large cross-sections
  • Energy storage and utilities 

Engineering at its best 

  • Numerous services for your entire project cycle, from feasibility, planning and construction to renewal of your infrastructure
  • Trained specialists and experts in planning and design, geotechnics, and project management
go back
go to website
Amberg Technologies

Infrastructure experts 

  • Rail, metro and tunnels
  • Underground spaces
  • Mining and shafts 

Systems and solutions 

  • Slab track, tamping, mapping, surveying and inspections
  • Tunnel machine guidance
  • Tunnel profile measurements and stakeout
  • Undulation
  • Layer thickness control
  • Surface inspection
  • Geological predicting during tunnel excavation
  • Surveying, data analysis and maintenance
go back
go to website
Amberg Infra 7D

Digital infrastructure experts 

  • Data acquisition and processing
  • Monitoring
  • Measurement of geotechnical tasks
  • Maintenance and operation
  • Process optimisation and digital continuity 

Solutions and services 

  • Geo-monitoring
  • Mobile mapping
  • Geomatics
  • Inspection services
  • Digital construction
go back
go to website
Amberg Loglay

Smart cities and construction logistics experts

  • Manage stakeholders across the value chain
  • Improve construction mobility in dense cities
  • Unlock up to 50% of the true potential of assets
  • Integrate circular economy principles into construction
  • Use smart data throughout the supply chain 

Solutions for construction sites 

  • End-to-end digital logistics processes
  • Rapid prototyping and smart sensors (IoT)
  • Logistics concept and manual (3D/4D)
  • Integration of logistics data
  • Logistics insights management (LIM)
  • Construction logistics management (CLM)
  • Management of external hubs and consolidation
go back
go to website
Amberg Infocon

Design and construction experts 

  • Design and BIM integration
  • Coordination between different disciplines
  • Information workflow setup
  • Facility management and BIM integration
  • Visualisation 

Services 

  • BIM implementation and creation of models
  • Clash detection, coordination and clash resolution
  • Construction documentation and shop drawings
  • 4D simulation and 5D estimation
  • Underground utilities
  • Laser scan to as-built models
  • IT solutions – BIM integration with FM application
go back
go to website
VersuchsStollen Hagerbach

VersuchsStollen Hagerbach - The underground future lab 

Recently named a research infrastructure of national importance, we have been providing the space and expertise to turn visions into innovations for over 50 years. 

Your analysis and testing requirements 

  • Real scale test and prototype environment
  • Analysis of construction material
  • Training facility
  • Unique location for your event 

Our facilities and services 

  • Various test sites, test procedures and management
  • Concrete and rock laboratory
  • Training environment and syllabus
  • Seminar rooms, event cavern and restaurant
go back
go to website
QAECY

AI agent as a service for the construction industry 

  • AI agent dedicated to the AEC industry
  • Easy access to complex project information
  • Helps in taking confident, informed decisions
  • Opens data silos, unlocks all content and uncovers context
  • Effortless interaction with your most valuable asset – your collective knowledge 

Solution and services 

  • AI agent as a service
  • Strategic consulting and training
  • Development of tailored solutions
go back
go to website